When constructing a durable and reliable foundation for commercial-grade facilities, you cannot underestimate the importance of a well-prepared concrete floor. A recent project in Indus AB, that not only involved the installation of a robust 5-inch concrete floor but also incorporated galvanized u drains and a double sump pump system was completed in only a week.. What makes this project even more impressive is that it was completed during the harsh conditions of winter, proving that with the right expertise, construction can thrive in any weather.
The heart of any strong foundation lies in meticulous planning and preparation. We didn't just stop at laying concrete; we went the extra mile by incorporating 2 inches of under-slab insulation.
To enhance the drainage system of the floor, we opted for a galvanized u drain. This feature serves as a channel for water to flow away from the foundation, preventing water damage and ensuring the structural integrity of the concrete floor over time.
Our project incorporated a double sump pump system to efficiently manage excess water and prevent any potential flooding issues. This redundancy ensures that even in the most challenging weather conditions, the facility remains dry and secure.
Taking on a construction project during the winter can be a daunting task, At Rocky View we embrace challenges. The recent cold spell did not deter us from completing the job promptly.
One of the unique aspects of our construction services is our commitment to working all year round and serving all of western Canada. So, whether it's a scorching summer day or a freezing winter night, you can trust us to get the job done.
Thanks to Integrity Post Structures for once again having us on board.
If you're considering a construction project, don't let the season hold you back – we are equipped to handle it all.
Contact us today (403) 888-7586, for more information on Post Frame Building Concrete Solutions